I worked on the Milwaukee Road railroad for two summers. The first summer
we spent fixing the line that ran from Alden to Jackson along the Southern
Minnesota border. Our railroad gang started out around 200 strong just
after the Fourth of July and ended up about 80 in late September.
Many of the crew spent their initial days leaning on a tool.
Every Friday for the first month foreman would walk
along the line and fire that weeks' quota of guys who
didn't subscribe to the
"Asses and Elbows" standard.
That standard was when a foreman look down the grade (i.e. looked in one direction
off into the distance) they just
want to see guys bent over working with arms flailing - "Asses and
Elbows". Some guys just quit because the work was
exhausting. At 4 p.m. both summmers I worked on the railroad I went to bed
immediately after I got home. I was so tired I didn't wake up to eat dinner.
The foreman fired fewer and fewer slackers each week.
But even after the crew was slimmed down and
stabilized, the paranoia of being fired for not working hard persisted.
This led to rock throwing, which is detailed in "Rocks".
A large track repair project is managed by a Road Master who
is responsible for the work to be done by the Extra Gang. An "Extra Gang"
is a group of workers organized for a purpose. There were also the Section
Gang who were in charge of all railroad repairs in a given territory. A big
gang might be broken up into smaller functional units.
The track we were repairing had many rotten ties it's hundred-odd mile length.
It was so bad that the trains could not exceed ten miles per hour.
Before
the Extra Gang got going, our Road Master walked along the tracks and
painted a large white dot on the rail above the ties he wanted us to replace.
He did this with a small can of paint with a foam end in the shape of a dot attached
to a stick.
The Extra Gang spread out into clumps of men performing specific tasks.
In front the first year were the Sled Dogs.
A winch on wheels clamped to the tracks wound up a wedge or
sled placed under the
track and ties. As the winch reeled in the thick steel cables, the sled,
which spanned the width of the tracks and ties, cut underneath the ties
and lifted both three feet in the air.
Sled Dogs had to do a lot of digging to initially get the sled
underneath the rails. Anyone who
walked between the winch and the sled when the winch was winding up was
fired on the spot, and there was at least one firing. It seems the year
before the
cable snapped and cut a man in half. Maybe it didn't really happen; maybe
it was just a story to scare us.
The next group of men cleared the rotten ties out of the way.
Appropriately, this group of men was called the Tie Gang. In the late '20's
through the '40's the Section Gang put copper nails in the ties they replaced. The
head of each nail had the year on it in raised numerals. So we knew we were
replacing ties that were fifty years old and older. Sometimes these ties had
partially disintegrated, sometimes they were still held by their spikes to the
rail. In the later case someone used a sledge hammer to knock the elevated
ties off the rails.
We had ten pound and twelve pound sledge hammers. Sometimes many ties in a row
were good, sometimes many in a row had to be replaced. Not far behind the sled
the suspended rails and few good ties holding joining them together would again
be laid down on the railroad bed.
The next group of men, farther behind the sled, placed new ties under the rails,
which again rested on the ground. They were also part of the Tie Gang.
Several weeks before, a train with flatcars and
gondola cars full of new ties came along and these were thrown
off into the railroad ditch. These new ties smelled strongly of creosote, the black oily
substance soaked into ties to preserve them during their 50-odd year lifetime.
I should
mention that wooden railroad ties can weigh up to 80 pounds. You or you
and another guy could
drag them using rail tongs, or you or you and another guy could just
carry the tie. Rail tongs look like big curved scissors. The ends turn
in and come to a point. If you squeeze the handles together the ends
nip into the tie and dig in a little. You get pretty tired
wrestling ties all day. You wear gloves and a long sleeve shirt to
keep the creosote off you.
This group of tie replacing men had a
small push car that they used. It held extra new ties in case
too many new ties were needed in a certain stretch of track and not enough
new ties had been thrown off in that local area. Whenever too many new ties
had been thrown off in a particular area, they were loaded onto this push car
for use up the line. Sometimes this push car and
a couple guys would make it to the very back of the gang to pick up ties.
If new ties didn't fit under the track, someone with a shovel had to
dig out under the tracks until they would.
Right behind where the new ties are being put down the next group
spikes down just enough ties to give the rail the right gauge, or
distance between the two rails. They put a tie plate on each side of the
track under the rails and drove down spikes - two on each side
of the track positioned diagonally. The
track gauge itself was metal rod with a lip on each end that fit
along the inner rail surfaces. If every ten feet or so of rails were
gauged properly then the rest of the ties could be spiked down without
having to check the rail-to-rail distance.
One particular older foreman
liked to gauge
track with a
couple of hand picked younger guys that he took a liking to. This
foreman had been shot in the forehead with a .22 by his ex-wife. It was
pretty gross, yet fascinating to watch this skin-covered bullet hole in
his forehead undulate do to his high pulse rate
from the labor of swinging a spike maul.
A couple of fellows (or gals: we had two)
scurry around centering tie plates under the rails above the
rest of the ties.
The outside edge of some tie plates have
a lip on it that fits against the outside edge of the rail. Some
tie plates have two ridges and the rail fits snuggly in the middle.
Plate
People carried a stack of tie plates around to where they are needed.
It's and it's like
carrying a heavy wobbly bowling ball around.
Next it's time to actually spike the rail to the ties. A claw bar is
a very heavy tool (maybe 30 pounds) that has a narrow wedge shaped top
and a
bottom the size of your fist shaped like your index and middle fingers
spread apart.
This split is just the right distance apart to grasp spikes. If you need to
remove a spike, one gets the head of the spike in this slit of the lower
claw and uses leverage to withdraw it. This sometimes takes a lot
of strength, especially if you are removing a bent spike from a new
tie. You also have the job of removing any bent or loose spikes
from old ties that weren't replaced. If you can't get a spike to
fit tight using the old spike holes, you use any of the other holes
in the four hole tie plate to get at least two spikes in, even if
you have to violate the "diagonal" rule.
When spiking a tie one man with a
claw bar stands sideways to the rail and puts the wide end of the bar
under the tie. He leans the lower part of the claw bar against either
nearby tie and pushes the top of the claw bar down. This raises one end
of the
tie to be spiked and it's tie plate up tight against the rail. Sometimes
a couple of attempts are made in order to get a tight fit. You can't
spike if the tie and plate aren't held tightly to the rail - the
blow of the spike maul would hurt the hands of the person holding the
claw bar.
Once snug, the person spiking starts a spike into the tie just like
you start a nail into a piece of wood. Then he straightens up and
begins to drive the spike into the tie. Each tie plate.
has four holes in it. We only drove in two spikes diagonal
from each other. At first you bend and ruin a lot of
spikes. Spiking over the rail breaks spike maul handles easily
if you miss. There were times when we had to stand around until
a couple of guys went and put new handles on spike maul heads because
we had broken all the handles.
The head of a spike is not much bigger that a quarter, and the spike
maul head is about the size of a Kennedy fifty cent piece. It's hard
to do at first, but like anything else you eventually get the hang
of it. One trick is to let the weight of the maul head do the work,
not your own downward force.
Spikes came in small metal barrels.
If you were lucky, Plate people would have tossed a couple of spikes
near each new tie, otherwise you had run around and get you own.
Sometimes you used a straight metal lining bar to hold ties for spiking.
They were
maybe five feet long and about three inches thick.
Lining bars were intended
to move finished track from side to side. A bunch of guys with lining bars
dug the bars at a 45 degree angle under the same rail. At the command,
"Yo heave", everybody pushed up against the rail until your lining bar
was perpendicular. This was hard to do - we had track lining machines
that did the actual track lining, thank God we didn't have to do it
much.
There are also
rail anchors to be put back on. Rail anchors look like the letter "j"
and are make up of thick steel. Over time, the force of moving
trains can actually make the rail slide in one direction, especially
around turns. If four or
so
rails shift it can open up quite a gap and put a train on the
ground. Rail anchors are pounded
on the outside of the rail near a tie. The long part of the
"j" goes under the rail and you hit the rounded part just so to
snap them on. Now if the rail starts to migrate, the rail anchor comes
into contact with the tie and won't let the rail slide any further.
The next to last group of men was still further behind the sled.
You could
be talking a quarter of a mile to a mile by now.They are the Gandys,
short for Gandydancers.
Sometime between
when the first part of the crew quit working the day before and nightfall
the Gravel Train has been by. It dumped rock which covered the spaces
between the ties we had been replacing.
You get a shovel full of rock, then
aim it under a tie that has a hollow spot underneath it. You shove
the shovel under the tie as hard as you can and then lift the shovel
to nearly vertical and jump on the footrest of the shovel several times.
This "tamps"
or forces
rock under the tie. This is called Gandydancing
since from afar it looks
like twenty or thirty men are hopping up and down and dancing.
I can still picture the
hard purplish rock we shoveled for a time that first summer.
We had a large mechanical
tamping machine, too. It went last. It's large mechanical claws
fit around and under ties and did the final tamping. We just had to
throw shovel loads of rock near the tie for the Tamper's claws
to jam under the ties.
The final group is called the Dinger Gang. These guys are quality
control and fix up any kind of error made by the first groups. You
may still have to dig out a bad tie by hand and replace it. You replace
bent spikes or missing spikes, and missing tie plates. You replace
broken angle bars. Angle bars are two heavy plates that fit on
each side of the rail where two rails come together. The end of each rail
has two holes in it, and each angle bar has four corresponding holes -
two for each rail end. Four heavy bolts go through the angle bars/rail
and are tightened by huge nuts. An angle bar can be cracked and have to be
replaced, or else bolts can be sheared off and need to be replaced. Sometimes
a rail may be replaced. Our rail was 75 pound rail. That means every
three feet weighs 75 pounds.
Our rail had dates on it, mainly
from the 1920's.
This last picture shows a view of two pieces of rail joined
together by a pair of angle bars. We were told never to spike down an
angle bar. We would have tried to get the ties on either side of
this angle bar and then spike it down. Almost all these
pictures were taken at the old Milwaukee Road yard in Austin, MN.
We worked in this yard the second year, fixing one of the sidings.
This was one of the spots we saw Chili Face. My Grandfather was
a dispatcher for the Milwaukee in Austin.
The picture of the small push car is from the NorthWestern line
in London, MN.
|